<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=661518255730730&amp;ev=PageView&amp;noscript=1">

SUCCESS STORY

TELENOT ELECTRONIC GmbH - Safety technology meets lean production

0%

Reduction in throughput time

0%

Reduction in processing time

0%

Reduction in space requirements

 

Brief introduction of the customer

For over 50 years, TELENOT ELECTRONIC GmbH has stood for the highest quality in electronic security technology - from access control systems, transmission technology, alarm and intrusion detection systems to fire detection technology. The company's management is characterized by lean management - practical, structured and consistent in its implementation.

  • Company: TELENOT ELECTRONIC GmbH
  • Number of employees: approx. 500
  • Project location: Aalen, Germany
  • Status: New customer

Project summary

TELENOT ELECTRONIC GmbH has successfully implemented work systems for blank concepts in electronics production with the help of BeeWaTec tube insertion systems. By switching to modular, flexible production solutions, the throughput time was reduced by 89% and the required space by 36%. The new approach not only increases productivity, but also enables practical, continuous improvement with the involvement of employees. By 2027, TELENOT plans to gradually implement lean principles across its entire end device production and beyond.

BEFORE

Initial situation and problems

TELENOT faced several challenges in electronics production:

  • Long training period: e.g. up to 9 months for the high-runner product “cryplock”
  • Outdated processes: Workshop production with one workstation per employee
  • Shortage of skilled workers: made even more difficult by complex process steps

AFTER

Implementing the lean production concept

TELENOT chose BeeWaTec as its partner for setting up its own lean workshop - including know-how transfer, material supply and on-site implementation of lean solutions from the pipe connector system. The starting point was an in-house certification workshop held by BeeWaTec at its headquarters in Pfullingen, Baden-Württemberg. The objective of the internal TELENOT project was to increase output by 50% while at the same time saving space and streamlining processes.

TELENOT's steps on the road to implementation

  • 1. Workshop-based development: cardboard prototypes of the new line designed and tested together with employees
  • 2. Iterative test operation: direct adjustments through live feedback during operation
  • 3. Digital redesign: implementation of the final solution in BEEVisio
  • 4. Realization with BeeWaTec components:
    • ESD-compliant design
    • Structure made from SUS tubes and modular elements
    • 15 flexibly combined trolleys, shelves and trolleys
  • 5. Material provision in advance: for fast implementation without loss of time

Added value and benefits for our customer

  • 88 % reduction in throughput time: from 36.7 to 4.5 working days
  • 36 % space saving: thanks to lean line design
  • Increased productivity: 4 employees per line, flexible cycle times
  • High flexibility: quick adjustments thanks to modular systems
  • Practical CIP: continuous optimization through employee involvement
  • Standardization & scalability: own modular systems for workstations & transport solutions

 

Simon Uttenlauch, Head of Lean Production Department

Our employees were skeptical at first - today they see the enormous potential. Through lean management and with the BeeWaTec system, we have not only improved workplaces, but also initiated a real cultural change: Work systems support the ideal workflows for processes and products - ergonomic, best-point, flexible, individual.”

0%

Reduction in throughput time

0%

Reduction in processing time

0%

Reduction of space requirements

BE LEAN, USE BEEWATEC.

Together we realize your success story.

With BeeWaTec's lean solutions, you can optimize your production processes and sustainably increase efficiency. Our flexible and modular systems adapt to your individual requirements and reduce waste in a targeted manner. The choice is yours: we supply individual components, kits and fully assembled lean solutions. 

Here you will find your personal contact >

START PROJECT